$50 = Free Shipping + Happy Shopping
4" x 2" Rubber Tread Cast Iron Keyed Drive Wheel - 12mm Plain Bore with Two 1/4" Set Screws - Heavy Duty Replacement for Industrial Equipment, Machinery, and Material Handling Carts
$61.22
$111.31
Safe 45%
4 4 4 4 4
4
4
4
4
4
4" x 2" Rubber Tread Cast Iron Keyed Drive Wheel - 12mm Plain Bore with Two 1/4" Set Screws - Heavy Duty Replacement for Industrial Equipment, Machinery, and Material Handling Carts
$61.22
$111.31
45% Off
Color:
Bore Size: 14MM (5mm W x 2.3mm D Keyway)
Bore Size: 14MM (5mm W x 2.3mm D Keyway)
Bore Size: 16MM (5mm W x 2.3mm D Keyway)
Bore Size: 12MM (4mm W x 1.8mm D Keyway)
Bore Size: 20MM (6mm W x 2.8mm D Keyway)
Bore Size: 18MM (6mm W x 2.8mm D Keyway)
Quantity:
Delivery & Return: Free shipping on all orders over $50
Estimated Delivery: 10-15 days international
12 people viewing this product right now!
SKU: 73110125
Guranteed safe checkout
amex
paypal
discover
mastercard
visa
apple pay
shop
Description
Rubber Tread on Cast Iron Keyed Drive Wheel Rubber on cast iron is the most versatile and cost-effective industrial wheel on the market. Rubber Tread Wheels Keyed drive wheels come in 4”, 5", 6”, 8” & 10" diameters. The rubber tread is liquid cast and chemically bonded to a Class 30 solid web cast iron center. The non-marking and non-sparking tread protects floors, rolls quiet and is resistant to most chemicals, while the high capacity load bearing wears like iron. Bore & Keyway Dimensions Keyed drive wheels come in a wide range of standard and metric bore sizes- see chart above. Set screws are also included- one on the keyway and one 90 degrees from it. Finally, a 90-95 Shore (A) durometer is also included, making this keyed drive wheel a great solution as a new or replacement part. Wheel Width Rubber keyed drive wheels come in 2" & 3" widths. Product listings are based on these attributes so when conducting your search be sure to specify one of these three widths to view all available wheels in that category. Service Caster is one of the largest caster and wheel companies in North America. For more than 25 years, we have designed, manufactured, assembled, and distributed casters worldwide from our location in West Reading, Pennsylvania. The Service Caster brand encompasses a broad range of casters and wheels designed for light to extra heavy duty applications and everything in between. Finely crafted from the highest quality materials, our casters will keep your projects rolling for years to come. Quality. Reliability. Excellence. Count on us to move you forward.
More
Shipping & Returns

For all orders exceeding a value of 100USD shipping is offered for free.

Returns will be accepted for up to 10 days of Customer’s receipt or tracking number on unworn items. You, as a Customer, are obliged to inform us via email before you return the item.

Otherwise, standard shipping charges apply. Check out our delivery Terms & Conditions for more details.

Features

Service Caster’s Rubber on Silver Cast Iron core wheels come in four different wheel sizes – 4" x 2", 5” x 2", 6” x 2", and 8" x 2".

Weight capacity 200 lbs. per wheel (Weight capacity can vary depending on load, torque, speed, duty cycle, environment, and coefficient of friction)

Five different bore sizes are available - 12MM (4mm W x 1.8mm D Keyway), 14MM (5mm W x 2.3mm D Keyway), 16MM (5mm W x 2.3mm D Keyway), 18MM (6mm W x 2.8mm D Keyway), and 20MM (6mm W x 2.8mm D Keyway). All wheel sizes have a 2-3/16" hub length. The hub length is the widest point of the wheel, so it is important to ensure you can accommodate this width before purchasing.

Rubber on cast iron is the most versatile and cost-effective industrial wheel on the market. The non-marking and non-sparking tread protects floors, rolls quiet and is resistant to most chemicals, while the high capacity load bearing wears like iron. Finally, featuring a 70-80 Shore (A) durometer, this wheel is a great option for anyone looking for a keyed drive wheel.

Find other wheel materials, sizes and all Service Caster products at our Amazon Storefront. Click on the “by Service Caster” link above the main title on any Service Caster page listing.


You Might Also Like